Add the wheel wells and some bracing today.
Mar 09 2020
Wheel wells and some bracing
Permanent link to this article: https://lbhsound.com/wp/wheel-wells-and-some-bracing/
Mar 07 2020
Lower frame is completed
Found my stride. Took a few days to raise the top floor and add the side ribs. Vince came by one night and we installed the new brackets for the side walls of the big truck. (We are now ready for the renegades!)
Along the way I cut and added a bunch of bracing …
Permanent link to this article: https://lbhsound.com/wp/lower-frame-is-completed/
Mar 02 2020
6-up
Torben came by and helped me work out some technical details. I think his edits are exactly right and I am suuuuuuuper glad to have his thoughts on these modifications.
He cut some of the larger parts and then took off to work on his own art. (Can’t wait to climb all over it!)
Slowly …
Permanent link to this article: https://lbhsound.com/wp/6-up/
Permanent link to this article: https://lbhsound.com/wp/truck-skeleton-design-03-01-20/
Permanent link to this article: https://lbhsound.com/wp/attaching-the-base/
Feb 22 2020
New base frame
Dumped the old truck bed at Sims. Ran over to US Metals and grabbed $500 of new steel. Unloaded the loot and went off to have a drink with an old friend (and ran into an even older friend). Returned to TLR and got to work @ 8. By 1am I had the new frame …
Permanent link to this article: https://lbhsound.com/wp/new-base-frame/
Feb 16 2020
Bye bye bed
Permanent link to this article: https://lbhsound.com/wp/bye-bye-bed/
Feb 13 2020
Side panels
To limit our renegade set-up/break-down time, we want to load our speaker cabinets in place and simply remove the side panels when we show up. Our side panels have lived inside the truck which has made this impossible to accomplish.
Jeff came up with a brilliant attachment mechanism allowing us to slide the …
Permanent link to this article: https://lbhsound.com/wp/side-panels/
Feb 11 2020
Build Day #1: Sunday, February 16, noon
What: Begin mutating the 1985 Ford F-250 Diesel When: 12 noon, Sunday, February 16, 2020 Where: Bridge Storage And Art Space 23 Maine Ave, Richmond, Ca. 94804 Who: Anyone who wants to build
So… we begin Sunday @ noon. Depending on who shows up to help, we may get the truck bed off and begin …
Permanent link to this article: https://lbhsound.com/wp/build-day-1-sunday-february-16-noon/
Jan 28 2020
Tuba 60 – 01-28-20
This is where it all began. We took the inspiration for our name from The Original Little Bass Head™ who we witnessed getting low at the Eastlake Music Festival 05/17/17.
—
We have been building the Bill Fitzmaurice Tuba 60 folded horns since 2015. We have now created a viable Open Source version …
Permanent link to this article: https://lbhsound.com/wp/tuba-60-01-28-20/