«

»

Mar 07 2020

Print this Post

Lower frame is completed

Found my stride. Took a few days to raise the top floor and add the side ribs. Vince came by one night and we installed the new brackets for the side walls of the big truck. (We are now ready for the renegades!)

Along the way I cut and added a bunch of bracing while laying down quite a bit more metal. Finally got the temperature and speed right on the Lincoln welder. Everything seems to be cruising along just fine now.

Happy Birthday Lori and Vince!

Permanent link to this article: https://lbhsound.com/wp/lower-frame-is-completed/

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>